Main Employer: National Iranian Oil Engineering & Construction Co.
Consulter: Tarh Andishan Consulting Engineers Co.
Location: Tang-e Fani, Lorestan Province
Route Length: 102 km, including route construction and canal drilling
Contract Cost: 339328042767 IR
Earthworks: 2159174 M³
Steel Operation: 35000 kg
Concrete Operation: 900 M³
Asphalt Operation: 103900 M2