Main Employer: Ministry of Road and Urban Development – Construction and Development of Transportation Infrastructure Company
Consulter: Harazrah Consulting Engineers Co.
Location: Ahvaz City, Khuzestan Province
Route Length: 15 km, including construction of two long bridges and fifty small bridges between Khuzestan steel Co. and Karoon River
Contract Cost: 268233937501 IR
Earthworks: 1543490 M³
Steel Operation: 1431800 kg
Concrete Operation: 26619 M³
Asphalt Operation: 4161200 M2
Piles: 1/664 m
Rockfill Placement (Boulder): 7525 M³